State license required
Alabama lets you qualify with classroom hours or with a long ride-along
Alabama licenses home inspectors through the Division of Construction Management. The rule that matters most is the choice it forces on a new applicant: 120 hours of class plus 35 supervised inspections, or 35 hours of class plus 100 supervised inspections. Both paths still require two exams and a stack of insurance.
Last verified against the official pages linked below. If a fee or an hour total is missing, it was not on those pages.
- Regulation
- License
- Look up a license
- Home and EIFS inspector roster
120 classroom hours, or 100 supervised inspections
Rule 355-17-1-.06 does not pick a single school package. An applicant either completes 120 hours of approved home inspector education and takes part in 35 home inspections, or completes 35 hours and takes part in 100 inspections. The inspections are under a qualified home inspector. Approved courses have to cover writing the report, and they have to be approved by the bodies named in the rule or by the Alabama Home Inspectors Advisory Committee.
There is a third file the division will look at even after those hours are done. The applicant drafts reports for 25 inspections. Ten of those reports have to be reviewed and corrected by a qualified home inspector. A reviewer qualifies by being licensed in their own state for the past five years, or, in a state without licensing, by five years in one of the groups the rule lists.
Four insurance numbers, not one round figure
Alabama does not publish a single liability limit the way Florida publishes $300,000. The rule splits it. The policy covering the inspection operation has to be at least $20,000 for property damage, $50,000 for injury or death of one person, $100,000 for injury or death of more than one person, and $250,000 in errors and omissions.
If you are hiring, ask for a certificate that shows those four amounts, not a generic 'fully insured' line on a website. The renewal rule ties the next license year to continued compliance with that insurance requirement.
The license is a calendar year, and November 1 is the renewal gate
A license is good only for the calendar year printed on it. It expires at the end of that year unless it is renewed. Renewal applications for the following year have to be filed with the Division of Construction Management by November 1. The director can reject a late application for that reason alone.
The fee that accompanies an application for a license, and an application to renew one, is $300. Fees are not refunded if the application is denied. Beginning with the 2021 license year, renewal also takes 15 hours of approved continuing education, and the licensee keeps the proof for three years. A renewing inspector who trains a new inspector through the rule's supervision steps can take a $50 credit on the next renewal, and no more than two of those credits in a year.
An optional Residential New Construction designation takes an eight-hour module finished no more than two years before that application. The rule says the designation is not required in order to inspect new construction. The division's public page is also where the roster search and the purchaser complaint form live. The program contact listed there is Phyllis Stallworth, (334) 242-4802.
The division says chapter 355-17-1 and the standards chapter 355-18-1 took effect September 14, 2019, applied to new applicants on March 15, 2020, and applied to renewals on January 1, 2021.
Other states that publish a real education-or-field tradeoff
- New York: License from the Department of State.
- Louisiana: License from the Louisiana State Board of Home Inspectors.
- Ohio: License under Revised Code Chapter 4764.
Compare the published hours, exams, insurance, and fees in the licensing table, or open the hire checklist for Alabama.
Guides that match this state’s rules
- How to check if a home inspector is licensed
- Home inspector insurance: errors and omissions and general liability
- Questions to ask before hiring a home inspector
Sources
Verified November 21, 2026. Send a correction with the official page.